Funds needed by February 2026 : $100,000

Anticipated Design Timeline

Phase 01

● Preparation of preliminary floor plans describing the overall configuration of the project.
● Development of schematic building designs, elevations, and sections illustrating the
overall configuration and its relationship to the site.
● Selection of the exterior palette, including materials, colors, and finishes.
● Coordination with owners, civil engineers, and other consultants to achieve proper
approvals for the project.

Planned completion February 2026

Phase 02

● Coordination of floor plans, reflected ceiling plans, floor covering plans, and electrical
and mechanical plans.
● Coordination of lighting design with the electrical consultant.
● Furniture and fixture layouts.
● Interior elevations with referenced finishes and details.

Planned completion May 2026

Phase 03

● Refinement of design imagery and style.
● Finish selections and floor covering specifications.
● Woodwork design and details, including iconostases and icon stands.
● Decorative lighting fixture design and details.
● Artwork schedules and conceptual selections.
● Furniture and fabric selections.

Planned Completion August 2026

Phase 04

● Final Floor plans.
● Reflected ceiling plans.
● Floor covering plans.
● Electrical and mechanical location plans.
● Exterior elevations with referenced finishes and details.
● Wall, interior, and joinery details.

Planned Completion December 2026